Monday, September 17, 2012
Floor Pans Continued
Picture of the driver's side pan being fit.
And from the inside.
It has been tacked into place, Next up I need to finish weld both fornt pans and move onto the rebuilding the rocker panels. There are also a few small patches to add on the floor and in the trunk. Then its off to the sand blaster to clean up the entire car before moving onto body work.
Monday, September 10, 2012
Fall Brings time for Floors
I was able to spend a good part of Saturday getting the driver's side floor pan fit and ready to weld in place. Pictures to follow.